CORAC shield fit and qualification checks
The manufacture study moves from an unpowered coil-fit article to measured evidence for placement and control.
Inspection and verification Interactive replay
Starting conditions
Start with an unpowered fit article and the proposed checks for placement, instrumentation and local protection.
Operating sequence
Check mechanical fit
Inspect support, access to connections, sensor mounts and the removal path on the unpowered article.
Verify electrical and sensor checks
Record continuity, insulation, probe positions and sensor calibration before controlled bench characterization.
Measure field and heat
Record repeatable field and temperature measurements with their inputs, positions and uncertainty.
Exercise local protection
Under ZSA-authorized tests, verify local isolation, discharge and recovery when feedback, cooling or supervision is lost.
Study coupling
Compare combined results from a second article with the separate measurements. Feed the field and heat evidence into the proposed site layout.
Hold and recovery
Keep fit, electrical, thermal and protective evidence distinct. Progress to the next test only when its prerequisites are recorded.
Model and references
Open the interactive cycleZENIT concept procedure. Models and replays use illustrative conditions.