Concept illustration from the ZENIT collection. Status applies to each listed output or research task.
Unexplored research proposal
○ Undone
What if an unusual observation could travel through the fleet as a question, with its uncertainty intact?
Proposed operation
○ Undone
Use Trell as the proposed receiver for a replacement instrument pallet.
Research development
○ Undone
Observation and anomaly identification feeding the fleet research workflow.
Proposed operation
○ Undone
Compare a second drone observation with returning the first sample to Trell.
Research development
○ Undone
The restored longitudinal fleet coordination and recovery vessel, retaining the central IT-Driver research role under Zorak strategic command.
Proposed operation
○ Undone
Compare the visitor’s and host’s timestamped accounts when a receipt is late or conflicts. Keep the original movement under its original ID.
Proposed operation
○ Undone
Deliver selected sealed samples to Trell in orbit through a separate, compatible surface-to-orbit craft.
Unexplored research proposal
○ Undone
Before asking whether an environmental pattern could matter to future travel, could we show that the pattern is real?
Research development
○ Undone
Four drone classes across Zorak, Anorak, Fronak and Norak.
Research development
○ Undone
The Qi Fleet’s Frequency Travel hypothesis proposes following a current in space by tuning its GENI shields to the current’s measured signature.
Research development
○ Undone
A separately tracked long-term research project within the Space branch.
Open physical qualification
○ Undone
Measure available charged-particle power, auxiliary demand, thermal limits and net gain on each candidate hull.
Research development
○ Undone
The 112 m QAC-1 R3 cruiser hosts two roadsters and six planetary-support drones.
Research development
○ Undone
A coordinated expedition architecture with Zorak strategic command, Centri coordination, research vessels, carriers, interceptors and Norak planetary operations.
Proposed operation
○ Undone
Retain Ranok as a candidate alternate receiving laboratory if Fronak is unavailable.
Proposed operation
○ Undone
Delay optional sample analysis when cooling is scarce. Preserve crew services and the proposed sample store within demonstrated capacity.
Open engineering check
○ Undone
Fronak’s cutaway sends a sealed canister out through a two-boundary lock. The adopted Trell operation uses external docking and sends the sealed canister inward. Anorak’s existing model sends an equipment pallet to a receiving fixture.
Proposed operation
○ Undone
Study Trell as the sending vessel for a crew handover through that shuttle.
Published visual study
✓ Done
An interactive visual walkthrough of the proposed ZENIT landing and support-transfer procedure.
Interactive cycle explanation
✓ Done
Atlas ranks a small set of observations by expected information gain while protecting energy, time, data and return reserves.
Published walkthrough
✓ Done
Atlas ranks a small set of observations by expected information gain while protecting energy, time, data and return reserves.
Model Atlas study
✓ Done
Explore Centri’s restored coordination, recovery and IT-Driver roles in a provisional longitudinal CFH-M1 hull, with protected systems and the 25-region shield.
Interactive cycle explanation
✓ Done
A sample moves from lunar collection through a monitored handoff to cold analysis and archive.
Published walkthrough
✓ Done
A sample moves from lunar collection through a monitored handoff to cold analysis and archive.
Model Atlas study
✓ Done
Open CORAC’s plasma core cutaway and explore the underground campus, three lunar lander bays and surface installations.
Interactive cycle explanation
✓ Done
The outpost drill follows one refuge branch from loss of fusion supply through protected reconnection.
Published walkthrough
✓ Done
The outpost drill follows one refuge branch from loss of fusion supply through protected reconnection.
Interactive cycle explanation
✓ Done
Lekor, Lomec and Larko share a lander design and a proposed common crew-transfer module.
Published walkthrough
✓ Done
Lekor, Lomec and Larko share a lander design and a proposed common crew-transfer module.
Published walkthrough
✓ Done
The manufacture study moves from an unpowered coil-fit article to measured evidence for placement and control.
Interactive cycle explanation
✓ Done
The manufacture study moves from an unpowered coil-fit article to measured evidence for placement and control.
Software reference
✓ Done
A compatible external berth can still leave insufficient cooling for a transfer. Evaluate the two vessels and the receiving sample store together.
Model Atlas study
✓ Done
Switch between Earth support concepts and the four Space fleet drone classes.
Published walkthrough
✓ Done
AGCM verifies route and docking geometry before the fleet commits to acceleration or a close approach.
Interactive cycle explanation
✓ Done
AGCM verifies route and docking geometry before the fleet commits to acceleration or a close approach.
Interactive cycle explanation
✓ Done
The research hypothesis asks whether a fleet could follow a putative current by tuning its shields to a measured signature.
Adopted operating concept
✓ Done
Trell docks outside. The sealed canister crosses once into Fronak’s receiving cradle. Fronak records the receipt and links each lab result to the original collection.
Design concept
✓ Done
The executive layout assumes a hull about 180 m long and 48 m in diameter, an operational mass of 1.3–1.6 million kg and a crew of about 160. It assigns 4–5% of an internal surface area to the radiators.
Interactive cycle explanation
✓ Done
The accountability model compares measured fuel receipts, use, permitted venting and remaining inventory.
Published walkthrough
✓ Done
The accountability model compares measured fuel receipts, use, permitted venting and remaining inventory.
Interactive cycle explanation
✓ Done
The optional Earth module uses electricity and treated water to produce conditioned hydrogen for storage and distribution.
Published walkthrough
✓ Done
The optional Earth module uses electricity and treated water to produce conditioned hydrogen for storage and distribution.
Interactive cycle explanation
✓ Done
Centri hosts the IT-Driver research interface and the FCMC-1 fleet readiness check. Zorak retains strategic command.
Reference simulation
✓ Done
In the CORAC steady-field reference, 0.24% more protons reached one 25 cm diameter detector than with the field off. The coil pair drew 36.71 J over one second and returned 0 J to the modeled buffer in that interval.
Fleet configuration study
✓ Done
The fleet study assigns each craft a KETS-1 configuration for short propulsion pulses. Larger ships use separate recovery branches where their power design supports them. Shuttles and drones ride with their hosts during a pulse.
Synthetic replay
✓ Done
The uploaded GENI chart accepted DOCKED at 6° phase error. The reviewed SFP-Min replay returned DOCK-HOLD. A +3 MHz carrier drift before opening also returned DOCK-HOLD.
Published visual study
✓ Done
An interactive visual walkthrough of the proposed ZENIT landing and support-transfer procedure.
Published walkthrough
✓ Done
Follow a single Qi survey sortie from orbital staging through landing, roadster and drone deployment, and recovery aboard Norak.
Model Atlas study
✓ Done
Rotate the 112 m QAC-1 R3 cruiser, inspect its loaded drone and roadster bays and compare the archived R1 drawing.
Interactive cycle explanation
✓ Done
Six phases trace a proposed planetary-cruiser landing, from acquisition of the landing base to mechanical support.
Published walkthrough
✓ Done
Six phases trace a proposed planetary-cruiser landing, from acquisition of the landing base to mechanical support.
Model Atlas study
✓ Done
Compare the original R4 base model with the proposed R3 landing envelope and force demands.
Published visual study
✓ Done
Explore the ZENIT Landing Base 3D concept. Inspect capture coils, cooling, power systems and the foundation in the cutaway view.
Model Atlas study
✓ Done
Rotate Trell’s reconstructed hull, inspect its cargo bay and docking collar, and replay the GENI docking decisions.
Interactive cycle explanation
✓ Done
The Diagnostic Hull Panel combines strain, temperature and acoustic arrivals to identify where inspection is needed.
Published walkthrough
✓ Done
The Diagnostic Hull Panel combines strain, temperature and acoustic arrivals to identify where inspection is needed.
Published research page
✓ Done
Explore the original five-layer, 25-region Aurora / Outverse vessel shield, its hull-sector map and ZENIT system integration.
Interactive cycle explanation
✓ Done
GENI coordinates the space shield’s five layers across five hull sectors, giving 25 controlled regions.
Published walkthrough
✓ Done
GENI coordinates the space shield’s five layers across five hull sectors, giving 25 controlled regions.
Published visual study
✓ Done
Inspect five crewed ZENIT planetary roadsters with battery-electric and hydrogen fuel-cell power and a shared storage-bay concept.
Interactive cycle explanation
✓ Done
The shared sequence checks confinement, cooling and local protection before allowing a core to supply energy to SERAT.
Published walkthrough
✓ Done
The shared sequence checks confinement, cooling and local protection before allowing a core to supply energy to SERAT.
Model Atlas study
✓ Done
Short geology traverses and inspections near a surface base.
Model Atlas study
✓ Done
Multi-stop survey routes and crew transport.
Model Atlas study
✓ Done
Carry tools, spare parts and replaceable surface equipment.
Model Atlas study
✓ Done
Survey routes with compatible refuelling infrastructure.
Model Atlas study
✓ Done
Move supplies between serviced surface facilities.
Published research page
✓ Done
Trace how ZENIT ground vehicles, aircraft, spacecraft and crewed planetary roadsters convert stored energy into motion.
Published research page
✓ Done
Explore KETS-1 propulsion configurations for the Qi Fleet, Trell docking and energy studies, and the sealed-canister handover replay.
Model Atlas study
✓ Done
Play Zorak’s drone and interceptor transfer, or rotate the Anorak, Fronak and Centri cargo cutaways.
Published walkthrough
✓ Done
Trace the local reactor trip and the two paths that still handle stored field energy and residual heat.
Model Atlas study
✓ Done
Compare the ZS-17 transfer shuttle and the compact multipurpose and first-aid craft. Inspect their drawing specifications and the ZS-17 science cutaway.
Model Atlas study
✓ Done
Rotate Ranok’s research hull, explore its modular labs and sample bay, or highlight an Outverse shield layer.
Published walkthrough
✓ Done
Choose a human-driven roadster and verify the bay, route, cabin and return reserves before release.
Published walkthrough
✓ Done
Inspect the returning roadster, secure it unoccupied and move it to the appropriate servicing state.
Story scenario
✓ Done
The earlier mission record departs Ritno on Earth at 11:00. The slide sequence moves to safe space, starts GENI, sweeps frequency with AXIOM and looks for an Earth reference before a proposed corridor transit. The story ends with reacquisition near Centauri A and landing at Imok.
Model Atlas study
✓ Done
Keep vehicles secured and ready for a later surface sortie.
Interactive cycle explanation
✓ Done
The reserve scheduler tests electrical power, usable energy and thermal capacity together before assigning optional loads.
Published walkthrough
✓ Done
The reserve scheduler tests electrical power, usable energy and thermal capacity together before assigning optional loads.
Model Atlas study
✓ Done
Rotate the through-hull Qi Fleet designs, inspect the drive corridors in cutaway and compare them with the current Atlas hulls.
Published walkthrough
✓ Done
Trell stays docked outside Fronak. Only the sealed canister crosses into the receiving cradle. The replay follows the host port, required services, custody receipt and lab result.
Synthetic replay
✓ Done
Trell holds when Fronak’s port turns in the agreed approach frame, even with zero carrier and phase error and an acceptable closing speed.
Published research page
✓ Done
Watch short concept films from ZENIT Earth and the Qi Vanguard Fleet.
Published visual study
✓ Done
Browse the ZENIT Model Atlas by program and model type. Inspect 3D vessels, vehicles and facilities, system maps and historical drawings.
Published research page
✓ Done
Explore ZENIT's Earth and Space solutions, shared systems and interactive Earth Research Facility concept.
Published research page
✓ Done
Explore ZENIT Space: project facts, design specifications, system architecture and the program reference.
Model Atlas study
✓ Done
Explore the Qi Vanguard flagship’s THD-1A through-hull drive, Fusion A and B plasma cores, and five-layer Outverse Shield.
Interactive cycle explanation
✓ Done
Follow two protected power feeds from Zorak’s fusion cores through SERAT to the THD-1A centreline drive. The shield coils have their own feed.
Published walkthrough
✓ Done
Follow two protected power feeds from Zorak’s fusion cores through SERAT to the THD-1A centreline drive. The shield coils have their own feed.
Published walkthrough
✓ Done
See when a loss of heat rejection during sustained thrust leads to derating or a propulsion hold.
Published walkthrough
✓ Done
Follow the protected power feeds and see what a stale CMC reference does to coil permission.