Skip to Operations
EARTH & SPACE / PROGRAM ATLAS
← Operations catalogue

Space CORAC

CORAC refuge outage and recovery

The outpost drill follows one refuge branch from loss of fusion supply through protected reconnection.

Fault response / Recovery Interactive replay

Starting conditions

One refuge branch loses fusion supply. The drill starts with a dedicated local reserve available.

Operating sequence

  1. Isolate the feed

    A fusion trip opens the SERAT tie. The model sheds deferrable loads and suspends surface-station reserve charging.

  2. Supply the refuge

    Available solar supplies refuge demand first. A local battery bank covers the remaining demand while usable energy lasts.

  3. Track the reserve

    Monitor battery energy and the remaining load. The drill records a shortfall when available supply falls below refuge demand.

  4. Check the restored feed

    When a fusion feed becomes available, reconnection remains on hold until AXIOM releases the tie.

  5. Restore protected supply

    Reconnect the released feed and record refuge continuity and remaining reserve before resuming the normal allocation.

Concept view of CORAC on the Moon with connected service corridors and a separate radiator field.
CORAC lunar outpost concept. The layout puts the service routes and heat-rejection area in context for the operation described here.

Hold and recovery

Keep the failed feed isolated and track the remaining reserve. Check the restored feed before transferring the protected load back.

Model and references

Open the interactive cycle

ZENIT concept procedure. Models and replays use illustrative conditions.