Skip to Operations
EARTH & SPACE / PROGRAM ATLAS
← Operations catalogue

Earth Earth Research Facility

Restore regional telemetry after link loss

Follow readings across the proposed Earth Research Facility. The cutaway opens the NEXUS and LSI suite and traces links to the SafeSpot services, observation mast and independent safety island.

Fault response / Recovery Interactive replay

Starting conditions

The proposed facility loses both regional data paths. Protected power and local instruments remain available in the study.

Operating sequence

  1. Measure campus conditions

    SafeSpot instruments report water, ventilation and reserve power. The observation mast contributes infrared and environmental readings. Local nodes attach the source identity and measurement time.

  2. Verify incoming readings

    A gateway at the NEXUS and LSI suite adapts signals from existing instruments. The verification rack checks source, age, sequence, message integrity and plausibility. It flags stale or conflicting readings for review.

  3. Give operators a local view

    NEXUS correlates the readings that pass verification. LSI shows conditions and confidence at the operator consoles. An on-site recorder keeps the readings and decisions for review.

  4. Share regional status

    The reporting gateway sends selected facility status over campus fibre or a proposed microwave link at the observation mast. A separate voice radio supports emergency coordination.

  5. Operate through link loss

    Both regional data routes are down. Protected SERAT power sustains local monitoring and event recording in this scenario. AXIOM and hardwired protection retain authority for local isolation.

  6. Recheck and reconnect

    The operator confirms fresh readings and checks the restored link before resuming regional status reports. The time-stamped outage record stays available for review.

The coastal Earth Research Facility campus.
The campus view gives the context for separate local monitoring and regional reporting paths.

Hold and recovery

Keep local monitoring and recording in service. Resume regional reporting after the link and fresh readings have been checked.

Model and references

Open the interactive cycle

The cutaway uses the Earth Research Facility campus geometry. Telemetry equipment placement, routes and the link outage are illustrative.

ZENIT concept procedure. Models and replays use illustrative conditions.