Skip to Operations
EARTH & SPACE / PROGRAM ATLAS
← Operations catalogue

Shared systems AXIOM and access controls

Personal ID, access and power loss

ZENIT checks identity, current duty assignment and the safety state before releasing a restricted operation.

Normal operation / Fault response / Recovery Interactive replay

Starting conditions

The procedure has a defined access role and a verified local safety state. The outage case includes a protected or manual route.

Operating sequence

  1. Verify identity

    Qi Fleet vessels validate crew eID locally. Earth SafeSpots use national eID for the first operator requesting activation.

  2. Check assigned access

    Check the current duty, qualification, credential status and required local procedure. Some critical work also requires an assigned key and AXIOM approval.

  3. Use local power while available

    The local reader can continue using current signed records while emergency power is available. Expired records hold new restricted requests.

  4. Apply the manual procedure

    During full power loss, designated mechanical releases support refuge and evacuation. Assigned crew use the local roster and authorized keys where the procedure permits.

  5. Confirm safe restoration

    Verify hatch conditions and local safety state. Restore critical operation only after the required checks and AXIOM approval.

Concept image of local credential verification at a controlled access point.
The access point is where current authorization and the local safety state meet. The outage procedure adds a protected or manual route.

Hold and recovery

Follow the approved manual route during power loss. Re-establish current authorization and safe conditions before normal access resumes.

Model and references

Open the interactive cycle

ZENIT concept procedure. Models and replays use illustrative conditions.